Sco-Terra Operations Group Inc. – Custom Container Modification
Description:
TargetBox partnered with Sco-Terra Operations Group Inc. to complete a custom 40ft High Cube container modification, purpose-built to support the company’s drinking water and wastewater operations in Staples, Ontario.
First, the container was prepped and painted for exterior durability, ensuring long-term protection in demanding environments. Entry is provided through a 36” commercial steel entry door, offering secure and reliable access.
Inside, the container features a complete liner package that includes 2×4 wood stud framing, 2” spray foam insulation, and 3/8” PVC sheeting, creating a clean, moisture-resistant and temperature-controlled workspace suitable for technical operations.
For added safety and functionality, the interior floor was upgraded with a 3/16” steel check plate that includes a 6” lip and anti-slip coating, ideal for heavy-duty use. The build also includes two custom floor openings and a steel-framed wall opening designed to accommodate an HVAC unit, ensuring ventilation and equipment integration. Following completion, the container was successfully delivered to Leamington, providing Sco-Terra with a durable, insulated, and highly functional solution built to perform in the company’s specialized field operations.
Location:
Staples, Ontario, Canada
Key Features:
- Exterior: Prepped and painted for durability
- Entry: Installed a 36” steel commercial entry door
- Interior Liner Package:
- 2×4 wood stud framing (walls & ceiling)
- 2” spray foam insulation
- 3/8” PVC sheeting for a clean, moisture-resistant finish
- Flooring:
- 3/16” steel check plate with a 6” lip
- Coated with anti-slip paint for safety
- Custom Openings:
- Two openings in the floor
- Steel-framed opening in the end wall for a Bard unit
- Delivery: Successfully transported to Leamington
Thank you to Sco-Terra Operations Group Inc. for allowing us to build this unit for you!









